Section 23:
Power to underpin building or otherwise strengthen it.
(1) If the metro railway
administration is of opinion that it is necessary or expedient so to do for facilitating the construction of
any metro railway or for ensuring the safety of any metro railway, it may, underpin or otherwise
strengthen any building within such radius not exceeding fifty metres from the metro alignment.
(2) The metro railway administration shall give to the owner or occupier of such building at least ten
days notice in writing before undertaking the work of underpinning or otherwise strengthening the
building:
Provided that where the metro railway administration is satisfied that an emergency exists, no such
notice shall be necessary.
(3) Where the underpinning or strengthening was executed in connection with--
(a) the carrying out of the works upon the land where any building is situated, or
(b) the construction or operation of any metro railway,
the metro railway administration may, at any time after the underpinning or strengthening of such
building is completed and before the expiration of a period of twelve months,--
(i) in a case referred to in clause (a), from the completion of such works; and
(ii) in a case referred to in clause (b), from the date on which traffic was opened in the metro
railway,
enter upon and survey such building and do such further underpinning or strengthening thereon as it may
deem necessary.